Monday, July 13, 2009

It is coming along!

The house has been moving along very quickly. It seems like every day we go over there it looks completely different. Only a little over a month until it is supposed to be done. Here are some pictures of the progress...
Here is our vanity. They still need to install the mirror and the lighting fixtures.

Here is the skylight in the master bathroom.


And the tile in the master shower and tub.




They installed the wood work for the columns in the living room!

The slate tile and mantle was installed around the fireplace

Here is the view of the living room from the kitchen. You can also see the cabinet and wine rack on the far left. We can't wait to start putting wine in that thing!


Here is the kitchen with the cabinets and tile done. They still need to put in the appliances and put the granite slab on the island. We love the little granite tiles on the back splash that will match the slab on the island.
Here is the dining room. The crown moulding and chair rails look great!


Here is the entry way. This is going to look totally different when the hardwood and the railings for the staircase are installed.
The outside of the house is painted but they still need to paint out the trim, install the shutters and install the rockery around the base of the house. They did install the driveway and path to the front door!!